Sustainable, decarbonised vanadium, titanium and iron extraction from Europe’s low-grade vanadium-bearing titanomagnetite deposits

Sustainable, decarbonised vanadium, titanium and iron extraction from Europe’s low-grade vanadium-bearing titanomagnetite deposits

Acronym

AVANTIS

Description of the granted funding

The EC’s Critical Raw Materials (CRM) Act sets multiple benchmarks for reducing Europe’s dependency on a few unlike-minded third countries for strategic/critical raw materials. Through the domestic extraction of two CRMs – “vanadium” (V) and “titanium metal” (Ti metal) – AVANTIS addresses the first target of the Act (> 10% domestic extraction, for V & Ti). AVANTIS’ rationale lies in the fact that Europe has a multitude of unexploited, low-grade V-bearing titanomagnetite deposits in Finland, Sweden, Greenland, Norway, Poland, Ukraine… However, these deposits have a complex “spiderweb-like” mineral assemblage. Without selective blasting, selective fragmentation and pre-concentration technologies to separate the Ti-rich ilmenite grains from the V-bearing magnetite, it is uneconomic to exploit these deposits. Supported by a bespoke forensic geometallurgy approach, AVANTIS develops a novel selective blasting approach that allows for rock excavation in view of increased mineral liberation at the blasting stage, and reduced energy demand in the crushing & grinding stages. Likewise, AVANTIS designs tailored, water-free and water-lean pre-concentration technologies that allow to produce two distinct pre-concentrates ((1) ilmenite-rich, Ti-pre-concentrate and (2) ilmenite-free, V-pre-concentrate). The water-lean method is also tailored to process V/Ti-bearing mining wastes from historical/on-going operations. The resulting flowsheets have a low net water consumption (> 70% water recycling) and reduced GHG intensity of extraction (reduction of 60–700 g CO2,eq per t ore hauled to the crushing plant). A preliminary analysis of the potential European reserves that are unlocked, yields a total of 154 Mt Ti & 3.5 Mt V (still excluding Ukraine), to be compared with current levels of EU consumption (1.5 Mt/y Ti; 12.7 kt/y V). AVANTIS strengthens the “responsible mining in Europe”-paradigm, increasing society’s trust in domestic CRM production.
Show more

Starting year

2024

End year

2027

Granted funding

876 200 €
Participant
841 374.95 €
Participant
Otanmäki Mine Oy
Participant
IMA ENGINEERING LTD OY
401 687.5 €
Participant
Australian Titanium Pty Ltd (AU)
Participant
TITANIA AS (NO)
108 750 €
Participant
PROXIS SP ZOO (PL)
141 000 €
Participant
POLYTECHNEIO KRITIS (EL)
405 812.5 €
Participant
AKADEMIA GORNICZO-HUTNICZA IM. STANISLAWA STASZICA W KRAKOWIE (PL)
573 375 €
Participant
UNIVERSIDAD POLITECNICA DE MADRID (ES)
563 937.5 €
Participant
NORGES TEKNISK-NATURVITENSKAPELIGE UNIVERSITET NTNU (NO)
509 182.5 €
Participant
KATHOLIEKE UNIVERSITEIT LEUVEN (BE)
691 750 €
Coordinator

Amount granted

5 113 070 €

Funder

European Union

Funding instrument

HORIZON Research and Innovation Actions

Framework programme

Horizon Europe (HORIZON)

Call

Programme part
Digital, Industry and Space (11704)
Advanced Materials (11708)
Topic
Innovative technologies for sustainable and decarbonised extraction (RIA) (HORIZON-CL4-2023-RESILIENCE-01-02)
Call ID
HORIZON-CL4-2023-RESILIENCE-01

Other information

Funding decision number

101137552